|
Showcase Projects
Kaiser Permanente
Project:
Medical Office Building
San Marcos
General Contractor:
DPR Construction, Inc.
Architect/Engineer:
Milo Architecture Group
Van Buren Kimper Eng
Electrical Contract:
$1,109,000.00
Description:
The medical office building at Kaiser houses the
typical exam rooms, a home health hospice, and
a pharmacy; all of which required hospital grade
equipment. The project design incorporated a dual
level lighting scheme, with the use of the Novitas
occupancy sensors. A MicroLite 1000 series was
put in place for the lighting control system,
with fixtures ranging from 2x4 parabolic
to concrete bollards. Electrically, the building
has one main SDG&E service. Over ten sub-panels
were put in place to distribute power to the building.
|
 |