Showcase Projects
South Bay Co-generation
Plant
Project:
Goodrich Aerostructures
San Diego
General Contractor:
University Mechanical
Architect/Engineer:
Mosher Drew Watson Ferguson
Dynalectric Company
Michael Wall Engineering
Electrical Contract:
$3,414,000.00
Description:
This design-build project will implement the use
of three Fairbanks Morse 3.2mw engine generator
sets to produce both electricity and hot water.
The total output of these generators is 9.6mw
at 12,470 volts. The characteristics of these
engines required them to be step loaded by 20%
at 15-second intervals. Medium voltage switchgear
was provided for the connection to the main plant
utility service. PLCs and fiberoptic cabling was
installed in order to communicate with the process
plant for flow and heating requirements. With
this design, the Co-gen is the primary supply
of power for the plant with SDG&E becoming
the back up.
|
 |