|
Showcase Projects
Colo.com
Project:
San Diego
Irvine
Los Angeles
General Contractor:
DPR Construction, Inc.
Architect/Engineer:
Ware & Malcomb
Dynalectric Company
TKG
Electrical Contract:
$3.2 million San Diego
$5 million - Los Angeles
$3.6 million - Irvine
Description:
Dynalectric San Diego has partnered with
DPR Construction and our Los Angeles sister
company to provide three facilities for this expanding
company. Each 25,000 square-foot facility
contains an elaborate electrical distribution
system consisting of AC, DC and UPS systems. Each
system was designed to meet N+1 redundancy including
maintenance bypass system capabilities
and 3 position disconnects on all HVAC and critical
systems. These projects were delivered with
a design-build, fast track format.
|
 |