Qualcomm Tenant Improvement, SAN DIEGO, CA
SCOPE OF WORK
This 260,000-square-foot design center tenant improvement consisted of two buildings and was required to adhere to an accelerated schedule, allowing only ten weeks for completion.
Dynalectric’s value on this project was evident in the design/assist effort, along with the necessary construction controls involving timely material delivery, coordination with other trades and implementing extensive scope changes.
The construction drawings were only 60% complete at the start of construction. The second project: Building “T” – was comparable to the design center, with extensive use of cable tray and Isoduct throughout the electronic labs.
This project was built with a very aggressive schedule, with a design that was in constant flux.